still have to put up the subway tile back-splash and grout
but this is the baking center.
this cabinet is painted and waiting to be put above the refrigerator...
it will be 3 inches above the frig. and flush in the front.
I guess this is Phase 2 1/2.
No comments:
Post a Comment